The upper reservoir of Gorona del Viento on El Hierro: a lined pool of green water at the bottom of a crater, surrounded by steep crater walls covered in vegetation, under a sunny blue sky
i24Esther•21 November 2026

Gorona del Viento: wind, a crater and diesel on El Hierro

You have almost certainly seen a wind turbine before. A white tower, three blades turning slowly on a ridge, the sea behind it. On El Hierro, in the municipality of Valverde, on the peak called Pico de los Espárragos, there are five of them, and it is easy to think that is all there is to it: the wind blows and the electricity comes.

The turbines are only the visible part of the system.

The power plant is called Gorona del Viento, and beyond the turbines it carries on into a crater, two reservoirs and four water turbines. Behind it all there is also a diesel power station. You can see it from the inside, but only by prior request: a visit has to be requested at least a week in advance, and it is for people over 12. You will find the details at the end of this article and on the company's visits page.

In this article we look at how wind and water work together, what the system has achieved year by year according to the official figures, and what it has still not achieved.

An island with nowhere to connect to

At home, when you switch on the light, you probably do not think about where the electricity comes from. On El Hierro that question is much closer to home.

The island's grid is not connected to any other grid. A 2021 press release from Gorona del Viento names El Hierro explicitly as an example of “non-connected territories”, where the variability of wind and sun makes it technically difficult to keep the grid frequency stable.

The wind, however, does not blow when the island switches its lights on. That is why Gorona is not simply a wind farm. In a talk quoted in the same press release, the company's managing director put it this way: pumped storage is “nothing more than a battery at our disposal”. Only this battery is not chemical. It is water and height.

The crater that became a battery

The upper reservoir is in the crater called La Caldereta, at an elevation of 709.90 metres according to the company's environmental statement. Endesa, one of the company's shareholders, describes it as a natural volcanic caldera. According to the statement, the reservoir has a usable capacity of around 379,600 cubic metres.

The lower reservoir is further down, near the Llanos Blancos thermal power station, in a natural valley closed off by a rock and earth dam built for the purpose. Its maximum water level is at 56 metres, and its usable capacity is around 148,500 cubic metres. That puts more than 650 metres of height difference between the two reservoirs.

According to the company's timeline, the first earthworks began on 25 August 2009, “in La Caldera, near Valverde”.

The water comes from rain. When the rain does not make up for evaporation, the company buys desalinated water from the island's water board, the Consejo Insular de Aguas de El Hierro.

How the system works on windy and still days

On a windy day the five turbines do the work, each rated at 2.3 megawatts, 11.5 megawatts in total. According to the company, the wind farm on its own can cover El Hierro's entire electricity demand. Whatever the island does not use goes into pumping water from the lower reservoir up into the crater. The pumping station's eight pumps have a combined capacity of 6 megawatts.

When there is little wind, water is let down from the crater through a penstock to the lower reservoir. There, four Pelton turbines turn it into electricity, 2.83 megawatts each, 11.3 megawatts in total.

When there is not enough wind or water, diesel steps in. This is not Gorona's own machinery but Endesa's Llanos Blancos diesel power station, and in the company's words it only starts up when there is not enough wind or water to meet demand.

The company sums it up like this: an intermittent, fluctuating energy source becomes a regulated and steady electricity supply, which also keeps the grid stable.

The installations are spread out between Pico de los Espárragos and Llanos Blancos, all in the municipality of Valverde, some of them inside protected areas, the Ventejís and Timijiraque protected landscapes. The majority shareholder of Gorona del Viento is the island's government, the Cabildo de El Hierro, with 65.82 per cent. Alongside it are Endesa with 23.21, the Instituto Tecnológico de Canarias, the Canary Islands institute of technology, with 7.74, and the Canary Islands government, the Gobierno de Canarias, with 3.23 per cent.

An idea from the 1980s

According to the company's own history, the idea was born in the early 1980s, when Unelco, today's Endesa, set up a department for alternative energy in the Canary Islands for the first time. Tomás Padrón was at that time both president of the Cabildo and managing director of Unelco.

In November 1997 the Cabildo approved El Hierro's sustainability plan, which already contained the idea of the island becoming self-sufficient. In December 2004 the Gorona del Viento company was founded; construction began in 2009 and was finished in September 2013. The inauguration took place in June 2014 at the wind farm, where the guests also buried a time capsule. According to Red Eléctrica, the plant went into operation at full capacity in July 2015.

What we know for sure: the figures, with their years

The figures differ from source to source and from year to year, so we give each one with its source. Red Eléctrica (REE) operates El Hierro's electricity system; the other figures come from Gorona del Viento's own annual reports and environmental statement.

According to REE, before the plant was commissioned in 2014, renewables covered only 2.2 per cent of El Hierro's electricity demand. The first period in which renewable sources covered the island's entire demand was on 9 August 2015, and it lasted two hours.

This is the share of the island's electricity demand that Gorona covered, year by year:

  • 2015: 19.5 per cent, but it only ran fully in the second half of the year (REE)

  • 2016: 40.8 per cent, its first full year (REE)

  • 2017: 46.5 per cent (REE)

  • 2018: 56.5 per cent (REE), 56 according to the company's own report

  • 2019: 54, 2020: 42, 2021: 48, 2022: 48 per cent (Gorona)

  • 2023: 35, 2024: 45, 2025: 44 per cent (Gorona)

REE confirms the 2025 figure: according to its booklet on the Canary Islands electricity system, 44 per cent of El Hierro's electricity was renewable, 43.6 from the wind and hydro plant and 0.1 from solar panels. The diesel engines supplied 56.3 per cent.

According to the company, the best production year was 2018 and the worst was 2023.

The longest stretches in which the island ran on renewable electricity alone: according to the company, 18 days between 25 January and 12 February 2018, and then 596 consecutive hours, more than 24 days, between 13 July and 7 August 2019. REE reported the latter too.

The number of fully renewable hours per year, according to the company: 892 in 2017, 413 in 2023, 859 in 2024 and 1,049 in 2025. The company also says that in 2025, 5,591 tonnes of diesel did not have to be burned to power the island.

The wind does not blow the same all year

The most interesting figure is not the annual average but the monthly one.

According to Gorona's annual report, in August 2024 it supplied 83 per cent of the island's electricity, and in November 7 per cent. In 2025 it was 71 per cent in June and 23 per cent in November. In August 2024 the wind farm produced more than fourteen times as much electricity as in November of the same year.

In 2019 the company wrote that coverage was expected to keep growing in summer, when the trade wind is stronger. We have written about the trade wind and how it shapes the islands' weather in our article on Canary Islands microclimates.

What it has not achieved, and what we do not know

Gorona del Viento has not covered El Hierro's entire electricity demand in any calendar year. Apart from 2018 and 2019, it supplied less than half every year. The company's vision is 100 per cent.

In its 2024 environmental statement the company gives two reasons why it has not got there: wind conditions and “the current, limited capacity of water storage”. Of the 2023 low point it writes that little rain fell, evaporation was higher and the upper reservoir was filled to an extremely low level.

We do not know why November 2024 was quite so weak. The wind farm produced little that month; the monthly report shows that much. The statement also mentions extraordinary maintenance work in 2024, but not in which month, and the company does not explain the cause of the November low anywhere.

Nor do we know why two official sources give two different figures for the same thing. For 2025, the number of fully renewable hours is 1,049 according to Gorona and 1,021 according to REE's booklet. In the same place REE also gives 178 “consecutive hours”. Neither source explains the difference, so we give both, each with its source.

And we do not know when and where the next step will be built. In 2023 the Cabildo and Endesa announced that a solar farm could join the system, and according to the company even the first 5 megawatt phase could deliver an average annual renewable share of 80 per cent. That is an estimate, not a measurement. On 16 December 2025 the Cabildo's plenary session rejected the motion that proposed the Los Dares site for the expansion, and it was agreed that a new motion would be drawn up, with a technical study of the feasibility and the possible sites. According to RTVC's report, the earlier studies are out of date. We have not found any more recent official decision.

Why this matters to you if you come in November

If you arrive on El Hierro in November, the light in your accommodation is more likely to be running on diesel than on wind or water. That was the case in the last two Novembers at least: in November 2024 the Llanos Blancos diesel power station supplied around 93 per cent of the island's electricity, and in November 2025 around 77 per cent. The system still works; according to the figures above, it simply has much less to give for part of the year.

On the island, electricity is tied to water as well. At the 10th anniversary, in 2024, the president of the Cabildo stressed the “close relationship” between clean power generation and desalinated water, and recalled that Tomás Padrón, one of the people who set the project in motion, called it “the Garoé of the 21st century”. According to legend, the Garoé was the sacred tree of the Bimbaches, El Hierro's original inhabitants, because it gave them the water they needed to live. You can learn its story at the Garoé Tree interpretation centre.

Gorona also brings the island money. According to the company's 2021 press release, the Cabildo uses the profits from its stake in Gorona to fund grants for self-consumption systems and for buying electric cars.

If your kitchen had a display showing whether your light was running on wind, water or diesel at that moment, would you switch it on at a different time?

If you want to see it

The plant can be visited, but not freely. According to the company's 2023 visiting rules, you have to request a visit at least a week in advance, visits are for people over 12, a group can have no more than 15 people, and you have to confirm again two days before the date, otherwise the visit may be cancelled. Bring an identity document (DNI, NIE or passport) and wear closed shoes. You will be given a helmet and ear protection on site. You can send your request in the ways described on the visits page, and check the current arrangements there too.

On the visit you learn about the history of the plant, see the pumps and the water turbines, and go to the lower reservoir and into the control room. According to the company's 2024 statement, it receives visitors almost every week.

If you are only curious about the figures, the company's statistics page has monthly and annual reports, and you can follow the island's electricity demand on REE's real-time viewer.

The wind that drives the turbines shows itself elsewhere on the island too: our separate article is about El Hierro's junipers, bent by the wind. If you are interested in the island's wildlife, read our article on the El Hierro giant lizard. Gorona also calls El Hierro the Island of the Meridian, and our piece on the Canary Islands lighthouses and the Orchilla prime meridian explains why.

Alongside the full El Hierro guide and the island's sights, we recommend our article What to see in El Hierro, our round-up of the quiet islands and our piece on the island's beaches and natural pools.


Sources: Gorona del Viento El Hierro, S.A.: Central Hidroeólica, Quiénes somos, Visitas and Información estadística y datos (website); Parte de producción, annual reports for 2018 to 2025, monthly reports for August and November 2024; Declaración ambiental año 2024 (EMAS); Normas de visitas a la Central Hidroeólica (2023); news items (2018, 2019, 2021, 2023, 2024). Red Eléctrica: press release (August 2019); El sistema eléctrico en las Islas Canarias 2025 (2026). Endesa: El Hierro renovable (project page). RTVC (16 December 2025). Gobierno de Canarias, Medusa: Tilo (2014).

Cover photo (cropped): the upper reservoir of Gorona del Viento in the La Caldereta crater, El Hierro, February 2026. Wikiyco, CC0, via Wikimedia Commons.

Related places

photo_cameraAttractions

Centro de Interpretación del Árbol Garoé

Centre about the Garoé, the sacred tree that supplied water to El Hierro's ancient Bimbache people.

location_onValverde
photo_cameraAttractions

Centro de Interpretación del Árbol Garoé

Centre about the Garoé, the sacred tree that supplied water to El Hierro's ancient Bimbache people.

location_onValverde
View detailsarrow_forward
parkParks

El Sabinar de La Dehesa

Forest of twisted juniper trees, a natural monument of El Hierro.

location_onLa Frontera
parkParks

El Sabinar de La Dehesa

Forest of twisted juniper trees, a natural monument of El Hierro.

location_onLa Frontera
View detailsarrow_forward
parkParks

Hoya del Pino

Hoya del Pino is a forest recreation area in the north of La Frontera, on El Hierro, set in dense laurel forest at a little over a thousand metres. It is reached by the HI-1 summit road and has tables, benches, barbecue stands, a playground, toilets, drinking water, parking and footpaths leaving from the site itself. At this altitude the trade wind mist rolls in often and temperatures stay well below those on the coast.

location_onFronteraGratis
parkParks

Hoya del Pino

Hoya del Pino is a forest recreation area in the north of La Frontera, on El Hierro, set in dense laurel forest at a little over a thousand metres. It is reached by the HI-1 summit road and has tables, benches, barbecue stands, a playground, toilets, drinking water, parking and footpaths leaving from the site itself. At this altitude the trade wind mist rolls in often and temperatures stay well below those on the coast.

location_onFrontera
Gratis
View detailsarrow_forward
cottageRural houses

Ecofinca Laurisilva

Organic farm with garden and natural livestock in northern Tenerife.

location_onTacoronte
cottageRural houses

Ecofinca Laurisilva

Organic farm with garden and natural livestock in northern Tenerife.

location_onTacoronte
View detailsarrow_forward
Crestas verdes del macizo de Anaga bajando hacia la costa con los Roques de Anaga
parkParks

Parque Rural de Anaga

Protected area and Biosphere Reserve covering the mountain massif at the north-eastern tip of Tenerife, some 14,500 hectares of ridges, ravines and hamlets linked by footpaths.

location_onSan Cristóbal de La LagunaGratis
parkParks

Parque Rural de Anaga

Protected area and Biosphere Reserve covering the mountain massif at the north-eastern tip of Tenerife, some 14,500 hectares of ridges, ravines and hamlets linked by footpaths.

location_onSan Cristóbal de La Laguna
Gratis
View detailsarrow_forward
parkParks

Cueva del Viento

Europe's largest lava tube, with a guided tour through lava galleries formed over 27,000 years ago.

location_onIcod de los Vinos20 €
parkParks

Cueva del Viento

Europe's largest lava tube, with a guided tour through lava galleries formed over 27,000 years ago.

location_onIcod de los Vinos
20 €
View detailsarrow_forward